IScheduledTaskPeriod

Description

The IScheduledTaskPeriod interface contains basic properties and methods that determine parameters of the task calculation period.

Properties

  Property name Brief description
StopDateTime The StopDateTime property determines the date when the period, in which the calculation of the task is performed, is over.
Type The Type property returns the mode of period assignment.

Methods

  Method name Brief description
Assign The Assign method sets parameters of task calculation period in accordance with parameters of the specified period.
Next The Next method calculates the next date and time of task launching relative to the specified date using the period parameters.

See also:

Fore Assembly Interfaces