ProjectPlanning > ProjectPlanning Assembly Interfaces > IPrjContradiction
The IPrjContradiction interface is used to determine task execution period contradiction.
The period contradiction appears on forecasted creation of task execution periods with different link types between them.
Property name | Brief description | |
![]() |
Dependency | The Dependency property determines a link between tasks. |
![]() |
Difference | The Difference property returns the number of days showing the difference in task execution period. |
![]() |
Follower | The Follower property determines a task following the predecessor task. |
![]() |
Predecessor | The Predecessor property determines a predecessor task. |
See also: