IMsBreakpoint.Enable

Syntax

Enable: Boolean;

Description

The Enable property determines whether a breakpoint is available.

Comments

True. The breakpoint is available and is taken into account on modeling problem calculation. Default value.

False. The breakpoint is not available and is not taken into account on modeling problem calculation.

Example

Executing the example requires that the repository contains a modeling container with the MODEL_SPACE identifier. This container must have a modeling problem with the PROBLEM identifier that calculates a model with the MODEL identifier. The example uses the MCallback class described in IMsproblemCalculationCallback.OnBreak.

Also, before starting the procedure add links to the Metabase, Ms system assemblies.

Sub Main;

Var

Mb: IMetabase;

ModelSpaceDescr: IMetabaseObjectDescriptor;

Problem: IMsProblem;

CalcSettings: IMsProblemCalculationSettings;

CallBack: MCallback;

Calculation: IMsProblemCalculation;

Breakpoints: IMsBreakpoints;

Breakpoint: IMsBreakpoint;

CalendarBreakpoint: IMsModelCalendarBreakpoint;

Model: IMsModel;

i: Integer;

Begin

Mb := MetabaseClass.Active;

ModelSpaceDescr := Mb.ItemById("MODEL_SPACE");

Problem := Mb.ItemByIdNamespace("PROBLEM", ModelSpaceDescr.Key).Edit As IMsProblem;

CalcSettings := Problem.CreateCalculationSettings;

CallBack := New MCallback.Create;

CalcSettings.Callback := CallBack;

CalcSettings.FactIncluded := True;

Calculation := Problem.Calculate(CalcSettings);

Breakpoints := Calculation.Breakpoints;

Breakpoints.Clear;

Breakpoint := Breakpoints.Add(MsBreakpointKind.ModelCalendar);

CalendarBreakpoint := Breakpoint As IMsModelCalendarBreakpoint;

CalendarBreakpoint.Name := "CalendarBreakpoint";

Model := Mb.ItemByIdNamespace("MODEL", ModelSpaceDescr.Key).Edit As IMsModel;

CalendarBreakpoint.Model := Model;

CalendarBreakpoint.CalendarPoint := DateTime.ComposeDay(2012, 01, 01);

Calculation.Run;

For i := 0 To Breakpoints.Count - 1 Do

Breakpoint := Breakpoints.Item(i);

Breakpoint.Enable := False;

End For;

Calculation.Resume;

End Sub Main;

After executing the example the breakpoint that is triggered if the MODEL model is calculated for 01.01.2012, is set for the problem. The problem calculation is started. All breakpoints are deactivated.

See also:

IMsBreakpoint