GetPositiveBackground: IChartBackgroundInfo;
GetPositiveBackground: Prognoz.Platform.Interop.Chart.IChartBackgroundInfo;
The GetPositiveBackground method returns fill color for positive chart columns.
Executing the example requires the Button component with the Button1 identifier, the Panel component with the Panel1 identifier, and an express report with the EXPRESS_REPORT identifier.
Add links to the Chart, Express and Metabase system assemblies.
Sub Button1OnClick(Sender: Object; Args: IMouseEventArgs);
Var
Chart: IChart;
MB: IMetabase;
Eax: IEaxAnalyzer;
a, r, g, b: integer;
Begin
//Connect to repository
MB := MetabaseClass.Active;
//Get express report
Eax := MB.ItemById("EXPRESS_REPORT").Edit As IEaxAnalyzer;
//Get chart
Chart := Eax.Chart As IChart;
//Get fill of positive columns
a := Chart.GetPositiveBackground.Color.A;
r := Chart.GetPositiveBackground.Color.R;
g := Chart.GetPositiveBackground.Color.G;
b := Chart.GetPositiveBackground.Color.B;
Panel1.Color := New GxColor.CreateARGB(A, R, G, B);
End Sub Button1OnClick;
After executing the example, after the button is clicked, a color for positive columns of EXPRESS_REPORT express report chart is set for the Panel component.
Imports Prognoz.Platform.Interop.Chart;
Imports Prognoz.Platform.Interop.Express;
Imports Prognoz.Platform.Interop.Metabase;
Private Sub button1_Click(sender: System.Object; e: System.EventArgs);
Var
Chart: IChart;
MB: IMetabase;
Eax: IEaxAnalyzer;
a, r, g, b: integer;
Begin
//Connect to repository
MB := Self.Metabase;
//Get express report
Eax := MB.ItemById["OBJ344"].Edit() As IEaxAnalyzer;
//Get chart
Chart := Eax.Chart As IChart;
//Determine whether connecting lines are displayed
Chart.IsConnectingLinesVisible := True;
//Get fill of positive columns
a := Chart.GetPositiveBackground().Color.A;
r := Chart.GetPositiveBackground().Color.R;
g := Chart.GetPositiveBackground().Color.G;
b := Chart.GetPositiveBackground().Color.B;
Self.panel1.BackColor := System.Drawing.Color.FromArgb(A, R, G, B);
End Sub;
See also: